Installation Guide

A Korean warm-floor system planned for US homes, remodels and commercial spaces.
Review the same installation flow, images and steps in English.

Charcoal Ondol Installation Video

1. Clean the site and install insulation sheet
STEP 1

1. Clean the site and install insulation sheet

Check subfloor condition, clean debris and install insulation sheet where specified before panels are placed.

Confirm subfloor flatness, moisture and door-clearance limits before installation.

Note: Final installation details depend on subfloor condition, local code, heat-source design and installer judgment.

2. Install Charcoal Ondol bottom panels
STEP 2

2. Install Charcoal Ondol bottom panels

Place terminal panels near the manifold location and install bottom panels according to the planned layout.

Plan manifold location and tubing length for each heating zone.

Note: Final installation details depend on subfloor condition, local code, heat-source design and installer judgment.

3. Install heating tubing
STEP 3

3. Install heating tubing

Lay tubing in balanced zones, avoid kinks and keep supply and return paths organized.

Keep tubing bends clean and avoid hidden joints under the finished floor.

Note: Final installation details depend on subfloor condition, local code, heat-source design and installer judgment.

4. Organize tubing near the manifold
STEP 4

4. Organize tubing near the manifold

Prepare supply and return tubing cleanly before connecting to the manifold or heat source.

Test circulation and pressure before finish flooring is installed.

Note: Final installation details depend on subfloor condition, local code, heat-source design and installer judgment.

5. Install Charcoal Ondol top panels
STEP 5

5. Install Charcoal Ondol top panels

Cover the lower panel joints with staggered top panels and secure them when site conditions require it.

Confirm subfloor flatness, moisture and door-clearance limits before installation.

Note: Final installation details depend on subfloor condition, local code, heat-source design and installer judgment.

6. Connect manifold and boiler
STEP 6

6. Connect manifold and boiler

Connect the tubing to the manifold and heat source using appropriate fittings and qualified trade coordination.

Plan manifold location and tubing length for each heating zone.

Note: Final installation details depend on subfloor condition, local code, heat-source design and installer judgment.

7. Install finish flooring
STEP 7

7. Install finish flooring

Test the heating system before installing compatible finish flooring such as tile, wood, laminate or LVP.

Keep tubing bends clean and avoid hidden joints under the finished floor.

Note: Final installation details depend on subfloor condition, local code, heat-source design and installer judgment.

Need professional installation support?

Share your project details and we will help review the best installation path.

Request Installation Help

Estimate Calculator

Enter the heated area and number of zones to review a rough planning estimate.

sqft
1

Estimate Details

Base installation (0 sqft)$0
Room controls (base + extra zones)$1,300
Estimated Total$0

This is a planning estimate. Final cost can change after site review.

Boiler work, permits, travel and finish flooring may be reviewed separately.